Zenit BlueBOX 150 Wastewater & Sewage Lifting Station 150L – 711118
Our lifting stations are designed to solve the problem of wastewater in locations such as basements and garages that are below the sewer line. They efficiently collect and lift clear rainwater, as well as wastewater from washing machines, sinks, and bathroom systems.
For more demanding jobs, the BlueBOX Series can be installed in a pit below ground. These powerful stations are built to handle everything from stormwater to raw sewage and industrial waste.
Whether you’re renovating a home or building a new one, these lifting stations are a must-have for a safe, low-cost, and eco-friendly way to manage your wastewater needs.
Easy to install, Including: cable gland, PVC delivery pipe** Ø 1½”, emergency draining connector, gasket kit for inlet pipe 1xØ110, 1×75, 1×50 mm, nr.1 special support to reduce the float switch level. Overflow alarm level OPTIONAL.
*Pump NOT included.
Rated volume from 60 to 500 litres
Suitable For: Sewage & Wastewater
Compatible with DG Blue, DG BluePRO, GR Blue ranges.
Dimensions (mm) : 804 x 544 x 635
Pack Weight: 13.70KG
Extension element for 250 and 500 litre models
Intake pipe diameter up to DN110
Delivery pipe diameter DN40/DN50
Constant, thick walls with horizontal reinforcing ribs
Contoured bottom to prevent stagnation and facilitate positioning of the pump.
Construction
1. Thick polyethylene tank reinforced with side ribs for strength and reliability.
Lifting and carrying handles integrated in the structure.
2. Arrangement for intake pipe connection on each side with standard dimensions engraved in the mould for precise wall drilling. Several tanks can be joined through a side duct to obtain multiple compositions and increase the total capacity of the system.
3. Through-wall fitting for emergency emptying (standard). Possibility of installing a gate valve (optional).
4. Slots integrated in the structure for floor fastening. The system uses normal expansion plugs, no special brackets are required.
5. Sturdy walk-over cover (max. permissible load 100 kg) with gasket to guarantee an watertight seal against liquids and odours.
6. Maximum level alarm float. (optional for blueBOX 60, 90 and 150 standard)
7. Air venting system with activated carbon filter and ready for connection to external pipework DN40. The safety valve with float ensures a tight closure of the pipeline if the level rises and prevents possible liquid spillage.
8. Direct installation of the pump with a quick coupling system for the delivery pipe that allows the pump to be easily separated from the system for maintenance without disconnecting the pipes from the lifting station.
9. Installation with bottom coupling device (DAC) to allow the pump to be taken out quickly, even when the tank is full. The coupling device is installed by means of a movable plate and does not require any tank drilling.
10. An extension element is available for the 250 and 500 models to raise the cover level by approximately 300 mm.
Certification
Thanks to careful design and testing, blueBOX has passed all the tests required by the European procedure for lifting stations and is certified according to 12050-1/2 standard, which sets out the requirements for pumping systems, in order to define the correct draining of wastewater with and without faecal material.
12 Month Zenit Warranty.